THE THINGS THAT MUST BE DONE

This post is vitally important as it maps out all of the things that have to be done for this project to be a work of collective genius - so read carefully.
As Individuals You Need to:
(week 12 - next Monday) Have;
1. fully designed and resolved your machine for production.
2.You must have CAD drawings with dimensions of every part you need to produce (this is for those that are having things laser cut and those that want to make it in the workshop - no excuses.
3. You need to have built a working prototype and posted all of the design work up to date on the blog.
(week 13 - last class)
You need to start assembling your machine and document the process and your thoughts on the blog.
(week 14) Your machine must be finished and we will assemble the larger radio machine.
(week 15) Your "Project Reflection" is due (see post on that) and we will have the grand opening.